| Old House Projects |
| The current owners of Albion House have enjoyed
fixing up our fixer-upper. Were proud to say that all the hard stuff is done.
Weve also enjoyed doing some historical research on the house and the projects she
has endured since she was built. |
| Approx. Date |
Owners |
Project |
| 1917-1918 |
|
House built |
| April 1929 |
E.A. Nock |
New Shake Roof |
| July 1937 |
E.A. Nock |
Rock wool insulation blown in to attic |
| June 1948 |
Dr. Harold. Van Detter |
Gas Conversion Burner installed, converting heat from coal to
natural gas. |
| About 1966 |
Frances |
Gravity furnace removed, forced air system installed. New
cold air returns added to living room and dining room. |
| Mid 70s |
Frances |
Kitchen remodeled butlers pantry (east end)
demolished.
Service porch removed and office/addition completed |
| Late 80s |
Monahan |
Extra phone line added. Wiring for cable TV installed. |
| September 1991 |
Bettinger |
Floors sanded and refinished |
| October 1991 |
Bettinger |
Security bars installed on basement windows |
| May 1992 |
Bettinger |
Wooden garage door replaced with steel ribbed door.
Opener refurbished |
| February 1993 |
Bettinger |
Upstairs bathroom gutted and remodeled. Stool moved to north
wall, sink moved to south wall. Vanity installed. |
| July 1993 |
Bettinger |
New water heater installed |
| Winter 1994 |
Bettinger |
Phase I rewire Upstairs and basement |
| Spring 1994 |
Bettinger |
Attic reinsulated and attic floor replaced. Attic fan
installed. |
| February 1995 |
Bettinger |
Phase II rewire Main floor minus kitchen |
| March 1995 |
Bettinger |
Front Hall holes patched, new light fixture installed.
Wall paper front hall and stairs |
| February 1997 |
Bettinger |
Security System installed |
| Spring 1997 |
Bettinger |
Kitchen Remodeled, rewiring completed |
| June 1997 |
Bettinger |
All new gutters installed |
| October 1997 |
Bettinger |
Exterior repainted. Main porch beam ends rebuilt. |
| Fall 1999 |
Bettinger |
Dining room remodeling completed, including stripping five
layers of paint from black walnut moldings and plate rails |
| Fall 2000 |
Bettinger |
New roof on addition completed. |
| June 2001 |
Bettinger |
New composite roof completed. |
| July 2001 |
Bettinger |
Stairs refurbished: all treads scraped, sanded and
refinished. Newel posts and balusters stripped and refinished, kick molding installed on
landing, staircase painted. |
| August 2001 |
Bettinger |
Dropped ceiling installed in office. Bookcase trim installed. |